Clip Pack #51 - 2023 HS2 Birmingham Early Construction and Development Drone With Timelapse

£2,250.00

This collection of 28 clips (13 minutes 10 seconds, 7.26GB) showcases the ongoing development of the HS2 high-speed rail project in Birmingham from February and March 2023. The footage includes stunning aerial views of the Curzon Street station site, Birmingham's city centre, the Bullring shopping centre, and Grand Central railway station. The pack features a range of construction activities, such as the use of diggers, cranes, earth-moving machinery, steel work, tunnels, and general site development.

Additionally, three premium drone timelapse sequences captured in ProRes422 quality offer an incredible look at the busy construction site, with moving machinery, cars, trains, and the dynamic Birmingham skyline in the background. This exclusive footage provides an exceptional perspective on the early stages of the HS2 project, perfect for high-quality documentary, infrastructure, and urban development projects.

This collection of 28 clips (13 minutes 10 seconds, 7.26GB) showcases the ongoing development of the HS2 high-speed rail project in Birmingham from February and March 2023. The footage includes stunning aerial views of the Curzon Street station site, Birmingham's city centre, the Bullring shopping centre, and Grand Central railway station. The pack features a range of construction activities, such as the use of diggers, cranes, earth-moving machinery, steel work, tunnels, and general site development.

Additionally, three premium drone timelapse sequences captured in ProRes422 quality offer an incredible look at the busy construction site, with moving machinery, cars, trains, and the dynamic Birmingham skyline in the background. This exclusive footage provides an exceptional perspective on the early stages of the HS2 project, perfect for high-quality documentary, infrastructure, and urban development projects.